How Much Does a Kitchen Remodel Cost in Las Vegas?

Cosmetic refresh, mid-range and full gut ranges for a Las Vegas kitchen, where the money goes, and how to keep it on budget.

10 min read Updated September 2026 By MA Remodel & Repair
How Much Does a Kitchen Remodel Cost in Las Vegas?

Key takeaways

  • A Las Vegas kitchen typically runs $18,000–$35,000 for a mid-range remodel and $50,000+ for a full gut.
  • Cabinets and countertops together are usually 40–50% of the budget.
  • The cheapest way to change a kitchen's appearance is cabinet refinishing plus new hardware — not new cabinets.

Kitchens are the most expensive room in the house to remodel and the one buyers care about most. Here is what a Las Vegas kitchen actually costs, and where that money goes.

Ranges, not quotes

Kitchen pricing swings enormously with cabinet line, countertop material and whether the layout changes. These ranges are for planning. A walkthrough and a written scope are the only way to a real number — and ours is free.

The three levels of kitchen project

LevelWhat it includesTypical Las Vegas rangeDuration
Cosmetic refreshCabinet refinishing, new hardware, new countertop, backsplash, paint, lighting$8,000 – $18,0001–2 weeks
Mid-range remodelNew cabinets, quartz or granite counters, tile backsplash, new sink and faucet, flooring, paint$18,000 – $35,0003–4 weeks
Full gut remodelLayout changes, moved plumbing and electrical, new everything, structural work, permits$50,000 – $90,000+6–10 weeks

Where the money goes

CategoryShare of budget
Cabinets25 – 30%
Countertops12 – 18%
Labour and installation15 – 20%
Appliances10 – 15%
Flooring7 – 10%
Backsplash and tile5 – 8%
Plumbing and electrical5 – 10%
Paint, trim and lighting4 – 7%
Permits and contingency5 – 10%

What drives the price up fastest

  • Moving the sink, range or refrigerator. Any layout change means plumbing, gas and electrical work, plus patched flooring.
  • Removing a wall. Once you are into structural work, permit and engineering costs follow.
  • Cabinet quality. The gap between a stock line and a semi-custom line is often larger than the gap between countertop materials.
  • Countertop material. Laminate to quartz is a modest jump; quartz to natural stone is a large one.
  • Surprises behind the walls. Water damage at the sink base, old wiring, or a missing shut-off valve.
  • Custom or special-order anything. Lead times and change fees both add up.

Do you get the money back?

Be realistic. A mid-range kitchen remodel typically returns roughly half to three-quarters of its cost at resale — it is a livability and marketability improvement, not an investment. Where a kitchen genuinely pays is when it is the reason a rental leases faster or a listing sells at asking instead of sitting.

If your only goal is resale value, cabinet refinishing, new hardware, a new countertop and paint will get you most of the visual result for a fraction of a full remodel.

How to keep a kitchen on budget

  • Decide the layout before anything is ordered. Layout changes are where budgets die.
  • Lock finishes and materials before demolition starts, so nobody is waiting on a decision.
  • Keep the plumbing and gas where they are unless there is a real reason to move them.
  • Choose cabinets and countertops from what is in stock locally.
  • Hold a 10% contingency. Every kitchen we open has one surprise in it.
  • Get one written scope with line-item pricing and a single point of contact.

What we typically see in Las Vegas homes

Based on our own repair work

From the kitchens we rebuild across the Valley:

  • The sink base is the most common surprise. On older Las Vegas kitchens it is frequently water-swollen, and the wall behind it is wet — that gets found on demolition day, not before.
  • Cabinet refinishing is the single best value in a kitchen when the boxes are sound. We refinish more kitchens than we replace, and the visual difference against new is small.
  • Layout changes are what turn a two-week job into a six-week one. Moving the range means gas, which means a permit, which means inspections.
  • The most common reason a kitchen job stalls is a delayed decision on finishes. Locking them before demolition starts is the single biggest schedule protection there is.
Real Las Vegas project
Problem

A Southern Hills rental kitchen had water-swollen cabinet boxes at the sink base, a delaminated laminate countertop, and flooring patched in three places. Coordinating a cabinet vendor, a countertop fabricator, a plumber, an electrician and a flooring installer would have stretched the job across six weeks.

Our solution

Demolition and haul-away, with the sink base removed and the wall behind it inspected for moisture, then a small area of water-damaged drywall repaired. New shaker cabinets installed, shimmed and scribed to the out-of-square walls. Quartz countertops templated after the cabinets were set and installed with a sealed sink cutout. Porcelain backsplash set over a prepared substrate. New plank flooring with clean transitions at the doorways, then a final punch walkthrough with the property manager.

Location

Southern Hills, Las Vegas, NV

Common questions

The questions we get asked most about this, answered plainly.

Have a property that needs work?

Free estimates with a written, line-item scope — usually within 24 to 48 hours. Tell us the address and the deadline and we will tell you plainly what it takes.