Kitchen Cabinet Installation in Las Vegas
Old cabinets out, new cabinets set level, plumb and scribed to the wall — with the countertop, sink and finish work handled by the same licensed construction company.
NV State Licensed · Fully Insured · CMRC Certified — Mold Remediation
Cabinets are the most visible thing in a kitchen and the most expensive to get wrong. Las Vegas walls are rarely square and floors are rarely level, so cabinets that aren't shimmed and scribed properly end up with doors that don't close and a countertop that rocks.
We set and shim every run, scribe the filler panels to the wall, and template the countertop after the cabinets are in — the order that keeps the seams tight. Because we also handle the drywall, paint and flooring around the install, the kitchen goes back together as one job instead of three.
What's included
- Removal and haul-away of old cabinets
- New cabinet installation, level and plumb
- Shimming, scribing and filler panels
- Soft-close hinges and drawer slides
- Countertop templating and installation
- Sink, faucet, hardware and finish work
Specifications
- Scope
- Removal of existing cabinets, installation of new base, wall and tall cabinets, filler and scribe molding, hardware, countertops and sink connections.
- Installation standard
- Cabinets shimmed and fastened to studs, runs set level and plumb, and filler panels scribed to out-of-square walls so the reveal is even from end to end.
- Hardware
- Soft-close hinges and full-extension drawer slides set and adjusted so every door closes flush and every drawer tracks square.
- Countertops
- Laminate and stone countertops templated after the cabinets are set, installed with proper support, with the sink cutout sealed and the faucet connected.
- Surrounding finishes
- Drywall repair, texture, paint, backsplash and flooring transitions handled in the same scope, so the kitchen isn't left half-finished between trades.
Cabinet replacement in a standard kitchen runs 3–5 days, plus countertop fabrication lead time where stone is used.
Before and after: kitchen cabinets
Dated cabinets removed and replaced with new cabinets set level, plumb and scribed to the wall.


Same kitchen, same angle — before the tear-out and after the new cabinets and countertop.
How we install kitchen cabinets
Measure, remove, set and shim, then countertop, sink and finish.
- 1
Measure and quote
We measure the kitchen, check the walls and floor for square and level, and give you a written quote with the cabinet and countertop options priced out.
- 2
Remove and prep
Old cabinets and countertops come out and get hauled away, then the walls are repaired and any electrical or plumbing that has to move is relocated.
- 3
Set and shim the cabinets
Base and wall runs are set level and plumb, shimmed to the floor, fastened to studs, and filler panels are scribed to the wall before anything is fastened down for good.
- 4
Countertop, sink and finish
Countertops are templated and installed, the sink and faucet are connected, hardware is adjusted, and drywall, paint and backsplash are finished to match.
Kitchen cabinet installation questions
What homeowners, landlords and property managers ask before replacing cabinets.
Related services
These are the services most often paired with kitchen cabinet installation on the same property.
Ready to replace your kitchen cabinets?
Send us photos of the kitchen and the measurements you have and we'll come back with a written quote — free, usually within 24 to 48 hours.
NV State Licensed · Fully Insured · CMRC Certified Mold Remediation


