Shower Renovation & Tile Replacement in Las Vegas
Failing showers and cracked tile rebuilt from the substrate up — new pan, proper waterproofing, new tile, new valve and a new glass door.
NV State Licensed · Fully Insured · CMRC Certified — Mold Remediation
A shower that leaks almost never fails at the tile. It fails behind it — at the pan, the seams or the substrate — which is why tiling over a bad waterproofing job only buys you another year or two. We strip the shower back to the studs, rebuild the pan and the substrate, and waterproof it properly before a single tile goes up.
That same visit also fixes what's usually behind the wall: a corroded valve, a soft section of framing, or drywall that has been quietly absorbing water. Because we're a licensed construction company rather than a tile-only crew, the repair and the rebuild happen under one scope and one schedule.
What's included
- Demo and haul-away of the old shower
- New shower pan and cement backer board
- Waterproof membrane at walls and pan
- New tile set to a dry-laid layout
- Shower valve, trim and glass door installation
- Drywall, texture and paint outside the shower
Specifications
- Scope
- Tub-to-shower conversions, full shower tear-out and rebuild, tile replacement, pan replacement, valve replacement and glass door installation.
- Substrate & pan
- Cement backer board over the studs with a sloped, pre-pitched pan and a fully taped and sealed waterproof membrane at every seam and penetration.
- Tile & setting
- Porcelain or ceramic shower tile set with modified thinset, 1/16-inch to 1/8-inch joints, and a leveling system on large-format tile to prevent lippage.
- Valve & fixtures
- Shower valve, trim, shower head and drain replaced while the wall is open, with shut-off valves checked and replaced whenever they don't hold.
- Glass & finishes
- Framed or frameless glass door installed and sealed, 100% silicone at every change of plane, and the surrounding drywall, texture and paint repaired to match.
A full shower rebuild runs 4–6 days including waterproofing, setting and grout cure. Tile replacement over a sound substrate runs 2–3 days.
Before and after: shower rebuild
An old, failing shower stripped back, waterproofed properly and rebuilt with new tile and fixtures.


Same bathroom, same angle — before the tear-out and after the finished shower.
How we renovate a shower
Tear out, rebuild the pan and substrate, waterproof, then set and finish.
- 1
Inspect and scope
We check the pan, the valve and the wall behind the tile, then give you a written scope with line-item pricing so you know what's being replaced before demolition starts.
- 2
Demolition and repair
The old shower comes out and gets hauled away. Soft framing, damaged drywall and a failing valve are repaired while the wall is open.
- 3
Pan, backer and waterproofing
A new sloped pan and cement backer board go in, seams and penetrations are taped, and a waterproof membrane is rolled or sheeted over the walls and pan.
- 4
Tile, glass and finish
Tile is dry-laid first, then set, grouted and siliconed, the glass door and trim go on, and the surrounding walls are textured and painted to match.
Shower renovation questions
What homeowners, landlords and property managers ask before a shower rebuild.
Related services
These are the services most often paired with shower renovation & tile replacement on the same property.
Shower leaking, cracked or dated?
Send us photos of the shower and the property address and we'll tell you what the rebuild involves and what it costs — free, usually within 24 to 48 hours.
NV State Licensed · Fully Insured · CMRC Certified Mold Remediation


