Bathroom Renovation in Las Vegas
Vanity, shower, tile, flooring, fixtures and paint handled by one licensed construction company — one schedule, one point of contact, one invoice at the end.
NV State Licensed · Fully Insured · CMRC Certified — Mold Remediation
A bathroom is where four trades have to work in the same eight feet: plumbing, electrical, tile and finish carpentry. Coordinating them separately is how a two-week renovation turns into two months of waiting on somebody's callback.
We sequence the whole job ourselves — demolition, rough-in, waterproofing, tile, fixtures and finish — so the work moves in the right order and the person accountable at the end is the same person who quoted it.
What's included
- Demolition and haul-away
- Vanity, mirror and fixture installation
- Shower and tub replacement or refinishing
- Shower tile, valve and glass door
- Flooring, baseboards and paint
- Exhaust fan, lighting and GFCI outlets
Specifications
- Fixtures & vanity
- Vanity, countertop, mirror, faucet, toilet, shower valve and trim installed and sealed, with shut-off valves replaced while the wall is open.
- Shower & tub
- Tub and shower replacement or refinishing, cement backer board, waterproof membrane, and a tiled or solid-surface surround with a new glass door.
- Flooring & tile
- Porcelain or ceramic floor tile set over a corrected substrate, with matching base or trim and a sealed transition at the door.
- Ventilation & electrical
- Exhaust fan vented to the exterior, vanity lighting, and GFCI protection at all bathroom receptacles per current code.
- Scheduling
- Plumbing and electrical rough-in sequenced with framing, waterproofing and tile so the job doesn't stall between trades.
Cosmetic refreshes — vanity, fixtures, paint and floor — run 1–2 weeks. Full gut renovations run 2–4 weeks depending on materials and lead times.
Before and after: bathroom renovation
A dated bathroom stripped back and rebuilt with new tile, vanity, fixtures and flooring.


Drag the divider to compare the original bathroom with the finished renovation.
How we renovate a bathroom
Scope and quote, demolish, rebuild, then finish — sequenced so nothing waits on anything else.
- 1
Measure and scope
We measure the room, confirm what stays and what goes, and quote the job with line-item pricing so you can adjust the scope before work starts.
- 2
Demolition and rough-in
Everything comes out and gets hauled away, then plumbing and electrical rough-in is completed and inspected before the walls close up.
- 3
Waterproof and tile
Backer board and membrane go in at the shower, then tile is set to a dry-laid layout, grouted and sealed.
- 4
Fixtures and finish
Vanity, toilet, mirror, lighting, fan, flooring, baseboards and paint go in, followed by a punch walkthrough before we call it complete.
Bathroom renovation questions
What homeowners, landlords and property managers ask before a bathroom remodel.
Related services
These are the services most often paired with bathroom renovation on the same property.
Thinking about a bathroom renovation?
Send us photos of the bathroom and what you'd like changed, and we'll come back with a written scope and line-item pricing — free, usually within 24 to 48 hours.