Vanity, shower, tile, flooring, fixtures and paint handled by one licensed construction company — one schedule, one point of contact, one invoice at the end.

NV State Licensed · Fully Insured · CMRC Certified — Mold Remediation

A bathroom is where four trades have to work in the same eight feet: plumbing, electrical, tile and finish carpentry. Coordinating them separately is how a two-week renovation turns into two months of waiting on somebody's callback.

We sequence the whole job ourselves — demolition, rough-in, waterproofing, tile, fixtures and finish — so the work moves in the right order and the person accountable at the end is the same person who quoted it.

What's included

  • Demolition and haul-away
  • Vanity, mirror and fixture installation
  • Shower and tub replacement or refinishing
  • Shower tile, valve and glass door
  • Flooring, baseboards and paint
  • Exhaust fan, lighting and GFCI outlets

Specifications

Fixtures & vanity
Vanity, countertop, mirror, faucet, toilet, shower valve and trim installed and sealed, with shut-off valves replaced while the wall is open.
Shower & tub
Tub and shower replacement or refinishing, cement backer board, waterproof membrane, and a tiled or solid-surface surround with a new glass door.
Flooring & tile
Porcelain or ceramic floor tile set over a corrected substrate, with matching base or trim and a sealed transition at the door.
Ventilation & electrical
Exhaust fan vented to the exterior, vanity lighting, and GFCI protection at all bathroom receptacles per current code.
Scheduling
Plumbing and electrical rough-in sequenced with framing, waterproofing and tile so the job doesn't stall between trades.
Typical timeline

Cosmetic refreshes — vanity, fixtures, paint and floor — run 1–2 weeks. Full gut renovations run 2–4 weeks depending on materials and lead times.

Before and after: bathroom renovation

A dated bathroom stripped back and rebuilt with new tile, vanity, fixtures and flooring.

Bathroom Renovation — after
Bathroom Renovation — before
BeforeAfterDrag to compare

Drag the divider to compare the original bathroom with the finished renovation.

How we renovate a bathroom

Scope and quote, demolish, rebuild, then finish — sequenced so nothing waits on anything else.

  1. 1

    Measure and scope

    We measure the room, confirm what stays and what goes, and quote the job with line-item pricing so you can adjust the scope before work starts.

  2. 2

    Demolition and rough-in

    Everything comes out and gets hauled away, then plumbing and electrical rough-in is completed and inspected before the walls close up.

  3. 3

    Waterproof and tile

    Backer board and membrane go in at the shower, then tile is set to a dry-laid layout, grouted and sealed.

  4. 4

    Fixtures and finish

    Vanity, toilet, mirror, lighting, fan, flooring, baseboards and paint go in, followed by a punch walkthrough before we call it complete.

Bathroom renovation questions

What homeowners, landlords and property managers ask before a bathroom remodel.