Service Details

Our Core Services, In Detail

How we scope and build the work behind the estimate — the materials, prep and standards we use on flooring, plumbing, painting and every other trade we coordinate across the Las Vegas Valley.

01 · Interiors & Finishes

Flooring Installation

LVP, laminate, tile and carpet — flat, tight and square.

Flooring is where a rental shows its age fastest, and it's the repair most likely to fail early when it's installed over a bad subfloor. We correct the substrate first, then install to the manufacturer's specification so the product warranty still holds.

What's included

  • Removal and haul-away of existing flooring
  • Subfloor repair, patching and leveling
  • Moisture testing on concrete slabs
  • Installation of new flooring and transitions
  • Baseboard reinstall or replacement
  • Final clean-up and debris removal

Before & after

Flooring Installation — after
Flooring Installation — before
BeforeAfterDrag to compare
See More

Technical specifications

Materials
Luxury vinyl plank (LVP), laminate, porcelain and ceramic tile, carpet tile and stretch-in carpet.
Subfloor preparation
High spots ground down, low spots patched with floor patch, damaged OSB or plywood panels replaced before anything goes down.
Moisture & vapor control
Calcium chloride or in-situ RH testing on slab; 6-mil vapor barrier or manufacturer-approved underlayment where required.
Installation method
Floating click-lock, glue-down or thinset bed depending on product; expansion gaps maintained at all perimeter walls.
Transitions & trim
T-molding, reducer and stair-nose selected to match flooring height; thresholds at exterior doors; baseboards reinstalled or replaced, caulked and painted.
Warranty compliance
Installed to manufacturer spec so the product warranty is not voided — including acclimation time and underlayment requirements.
Typical timeline

1–3 days for a standard 3-bedroom home. Tile or large-format work runs 3–5 days plus grout cure time.

02 · Interiors & Finishes

Interior Painting

Prep first, so the finish lasts past the next tenant.

A paint job only looks professional if the prep is right. We patch, sand, caulk and prime before a brush touches the wall — that's what keeps cut lines crisp and the finish durable in a rental that turns every year.

What's included

  • Full prep: patching, sanding and caulking
  • Stain-blocking primer on water stains and repairs
  • Two finish coats on walls and ceilings
  • Trim, doors, jambs and baseboards painted
  • Fixtures, floors and outlets masked and protected
  • Final touch-up and clean-up

Before & after

Interior Painting — after
Interior Painting — before
BeforeAfterDrag to compare
See More

Technical specifications

Surface preparation
Nail and screw holes filled, cracks caulked, glossy surfaces deglossed and sanded, peeling areas scraped and sealed before coating.
Products
100% acrylic latex. Low-sheen eggshell on walls and satin on trim as our standard rental specification; semi-gloss available for high-traffic areas.
Coating system
One primer coat plus two finish coats. Ceilings and trim cut in by hand rather than taped where a clean line is achievable.
Stain & odor control
Shellac or oil-based stain-blocking primer over water stains, smoke residue and previous dark colors to prevent bleed-through.
Protection
Floors, fixtures, outlets and hardware masked; plastic containment used when the unit is occupied.
Color matching
Single-color turnover packages or color-match to existing paint. Sherwin-Williams and Behr palettes available.
Typical timeline

1–3 days for a standard interior. A full house with ceilings and trim runs 3–5 days.

03 · Turnovers & Repairs

Minor Plumbing & Electrical

The punch-list items that stall a unit, handled in one visit.

Turnover punch lists are full of small plumbing and electrical items that hold up a move-in. We handle that minor work under one licensed construction company so you're not waiting on a second trade to schedule a single visit.

What's included

  • Faucet, toilet and disposal replacement
  • Shower and tub valve replacement
  • Supply line and shut-off valve repair
  • Leak repair and re-caulking
  • Switches, outlets, GFCI and dimmers
  • Light fixtures, fans and detectors

Before & after

Minor Plumbing & Electrical — after
Minor Plumbing & Electrical — before
BeforeAfterDrag to compare
See More

Technical specifications

Plumbing scope
Faucet, toilet, garbage disposal and shower valve replacement; angle stops and supply lines; P-trap and drain assembly replacement; active leak repair; tub and shower re-caulking.
Electrical scope
Switches, outlets, GFCI receptacles, dimmers, light fixtures, ceiling fans, and smoke and CO detectors.
Scope limits
Minor repair and replacement work only. No panel upgrades, gas lines or new circuit runs — larger plumbing and electrical work is referred to a licensed specialty trade so the job stays compliant.
Code compliance
GFCI protection installed in kitchens, bathrooms, garages and exterior locations per current code; work performed to Nevada licensing requirements.
Water shut-off
Angle stops replaced when they don't hold, so a future repair doesn't turn into a flooded unit.
Documentation
Photos of completed repairs and a line-item invoice for your maintenance file.
Typical timeline

Most punch-list plumbing and electrical items are completed in a single visit; fixture replacements are same-day.

04 · Turnovers & Repairs

Drywall Repair & Texture Matching

Repairs you can't find — because the texture and sheen match.

Holes, cracks and old water damage are the first thing a tenant or buyer notices. The goal isn't patching the hole, it's making the repair disappear — which means matching texture, sheen and paint, not just filling the gap.

What's included

  • Holes, cracks and stress fractures repaired
  • Water-damaged sections cut out and replaced
  • Corner bead and pop-out repair
  • Texture matching to the existing wall
  • Prime and paint blending
  • Ceiling and wall repairs in one visit

Before & after

Drywall Repair & Texture Matching — after
Drywall Repair & Texture Matching — before
BeforeAfterDrag to compare
See More

Technical specifications

Repair scope
Small holes through full sheet replacement, settling cracks, stress fractures at corners, water-damaged sections, damaged corner bead and popped nails or screws.
Materials
1/2" and 5/8" drywall, moisture-resistant board in bathrooms and kitchens, paper tape and setting-type compound for structural patches.
Texture matching
Orange peel, light and heavy knockdown, hand textures and smooth finishes matched to the surrounding wall by test panel before the full repair is coated.
Finishing standard
Three-coat patch sanded to a level-4 finish before texture, so the repair doesn't telegraph through the paint.
Paint blending
Patched areas primed and blended to the existing wall color and sheen. Where the paint is faded or a color match isn't possible, we'll tell you before we start rather than leave a visible square.
Cause repair
Water-damaged drywall is traced back to its source first — patching over an active leak just means doing the repair twice.
Typical timeline

Small patches are same-day. Larger or multi-room repairs run 2–3 days to allow proper drying between coats.

05 · Interiors & Finishes

Tile & Backsplash

Waterproofed properly, set flat, grout lines that line up.

Tile work fails at the waterproofing, not the tile. We build wet areas on cement backer board with a proper membrane and set every course to a dry-laid layout, so cuts land where they look intentional instead of wherever they fall.

What's included

  • Shower and tub surround installation
  • Kitchen backsplash and floor tile
  • Waterproofing membrane in wet areas
  • Layout planning and dry-fit
  • Grout, silicone and sealing
  • Fixture and trim reinstallation

Before & after

Tile & Backsplash — after
Tile & Backsplash — before
BeforeAfterDrag to compare
See More

Technical specifications

Applications
Shower and tub surrounds, kitchen backsplash, floor tile, fireplace surrounds and accent walls.
Substrate
Cement backer board or an approved waterproof substrate in wet areas — never drywall behind a shower.
Waterproofing
Roll-on or sheet membrane at shower walls and pans, with seams and penetrations taped and sealed before setting.
Setting materials
Modified thinset appropriate to the tile type; 1/16" to 1/8" grout joints; tile leveling system used on large-format tile to prevent lippage.
Grout & sealing
Sanded or unsanded grout matched to the tile, 100% silicone at all changes of plane, penetrating sealer on natural stone and porous grout.
Layout
Dry-laid first so full tiles land at the focal wall and cuts are pushed to corners and edges.
Typical timeline

A standard backsplash is 1–2 days. A full shower surround runs 3–5 days including waterproofing and grout cure.

06 · Renovations

Kitchen & Bathroom Renovations

One company from demolition to the final punch walk.

Kitchens and bathrooms are where a rental earns its rent — and where coordinating four separate trades costs you weeks. We schedule and sequence the whole renovation ourselves, so there's one point of contact and one person accountable at the end.

What's included

  • Demolition and haul-away
  • Cabinet installation or refinishing
  • Countertop templating and install
  • Vanity, mirror and fixture installation
  • Shower tile, valve and glass door
  • Paint, trim and flooring

Before & after

Kitchen & Bathroom Renovations — after
Kitchen & Bathroom Renovations — before
BeforeAfterDrag to compare
See More

Technical specifications

Cabinet work
New cabinet installation or professional refinishing; soft-close hinges and drawer slides; shimming and scribing to out-of-square walls.
Countertops
Laminate and stone countertops, templated after cabinets are set and installed with proper support and a sealed sink cutout.
Bathroom scope
Vanity, mirror, toilet, shower valve, tile surround, glass door, exhaust fan and flooring.
Mechanical coordination
Plumbing and electrical rough-in scheduled and inspected in sequence with framing and tile so the job doesn't stall between trades.
Permits & code
Work performed to current code, with permits pulled where the scope requires them.
Project management
One point of contact, a written scope with line-item pricing, and a final punch walkthrough before we consider the job complete.
Typical timeline

Cosmetic refreshes run 1–2 weeks. Full kitchen or bathroom renovations run 2–4 weeks depending on materials and lead times.

07 · Turnovers & Repairs

Rental Property Repairs

One vendor for the punch list, the turnover and the emergency.

Owning rentals means a steady stream of repairs, and the cost isn't in any single one — it's in coordinating three companies to handle them while the unit sits vacant. We work as an ongoing vendor for property managers and investors: one point of contact, one schedule across your portfolio, and one invoice per property.

What's included

  • Move-out repairs and make-ready work
  • Punch lists completed in one visit
  • Drywall, paint and flooring
  • Minor plumbing and electrical
  • Doors, trim, cabinets and fixtures
  • Water damage rebuilds and mold remediation

Before & after

Rental Property Repairs — after
Rental Property Repairs — before
BeforeAfterDrag to compare
See More

Technical specifications

Scope
Punch-list repairs, turnovers, drywall and texture, interior painting, flooring, tile, minor plumbing and electrical, doors and trim, cabinetry, water damage rebuilds and mold remediation.
Portfolio scheduling
One point of contact and one schedule across multiple properties, sequenced so vacants turn in the order your leasing calendar needs.
Access
Lockbox, gate code or key access — we complete the work and send photos as it progresses, so you don't have to be on site.
Documentation
A written scope with line-item pricing before work starts, photos of completed repairs, and a line-item invoice per property for owner reporting.
Emergency response
Active leaks and water damage get priority scheduling — tell us when you call and we'll work it in faster.
Typical timeline

Light punch lists are same-day to 2 days. Standard turnovers run 3–7 business days. Renovations run 2–4 weeks.

08 · Restoration & Rebuild

Water Damage Repair & Rebuild

The rebuild after the dry-out — walls, texture, paint, trim and flooring.

Getting the water out of a building and getting a usable room back are two different jobs. Extraction and drying are the mitigation phase, handled by a restoration company with that equipment. Ours starts the day the structure reads dry — we rebuild what the water damaged and hand back a finished room.

What's included

  • Rebuild walkthrough and written scope
  • New drywall hung, taped and finished
  • Texture matched to the surrounding walls
  • Primer and paint blended to the existing color
  • Baseboards, casing, doors and hardware
  • New flooring over a prepared subfloor

Before & after

Water Damage Repair & Rebuild — after
Water Damage Repair & Rebuild — before
BeforeAfterDrag to compare
See More

Technical specifications

Scope
The rebuild phase only. We don't perform water extraction, structural drying or demolition — that's the mitigation phase, handled by a restoration company with that equipment.
Walls & ceilings
New drywall hung, taped and finished to a level-4 standard, with texture matched to the surrounding wall from a test panel before the full repair is coated.
Paint & finish
Primer and paint blended to the existing color and sheen, with trim, doors and baseboards caulked and painted to match.
Flooring & cabinetry
New flooring installed over a prepared subfloor, plus cabinet, vanity and countertop rebuilds with fixtures and plumbing reinstalled.
Insurance documentation
Dated photos, a written scope and itemized invoicing you can submit to your carrier. Check with your adjuster on what's covered before work begins.
Typical timeline

A single affected room is usually 3–7 days once the structure is dry. Multi-room rebuilds with flooring and cabinetry run 1–3 weeks.

09 · Restoration & Rebuild

Mold Remediation

CMRC-certified remediation, containment and full reconstruction.

Mold is a symptom — the problem is moisture, and until the source is found and fixed, remediation is only a temporary fix. We're CMRC certified and a licensed construction company, which means the same company that contains and treats the affected area also rebuilds it, instead of leaving you to find a second contractor to finish the room.

What's included

  • Inspection and moisture testing
  • Containment with negative air pressure
  • Removal of affected materials
  • Treatment and cleaning of surfaces
  • Drywall, texture and paint reconstruction
  • Source repair and documentation

Before & after

Mold Remediation — after
Mold Remediation — before
BeforeAfterDrag to compare
See More

Technical specifications

Certification
CMRC certified (Certified Mold Remediator Consultant), and a licensed and fully insured Nevada construction company.
Inspection
Visual inspection plus moisture readings to locate the source and map how far the moisture has traveled.
Containment
Plastic sheeting and negative air pressure to keep spores from spreading into unaffected areas of the home while work is underway.
Remediation
Removal of affected drywall and materials, treatment and cleaning of the remaining surfaces, and drying before any reconstruction begins.
Reconstruction
New drywall, matched texture, primer and paint, trim and baseboards — the room finished back to a tenant-ready standard.
Source repair
The water source is repaired as part of the job. Remediation without fixing the cause means the mold returns.
Typical timeline

A single affected room is usually 2–4 days for remediation and drying, plus reconstruction. Larger areas with water damage typically run 1–2 weeks.

Not sure which service you need?

Send us photos of the property and a description of the work. We'll put together a written scope with line-item pricing — free, and usually within 24–48 hours.