Real Project Library

The Real Project Library

No stock photography and no vague claims. Every project below is a Las Vegas Valley property we completed — with the scope we ran, how long it took, and the before-and-after to go with it.

Freshly renovated Las Vegas rental home interior with new flooring, paint and trim

Completed work across the Las Vegas Valley

Drag the divider on any project to compare before and after, then open it to see the full scope, the timeline and what we found along the way.

Mold Remediation and Full Rebuild — before and after in Spring Valley — after
Mold Remediation and Full Rebuild — before and after in Spring Valley — before
BeforeAfterDrag to compare
Water & Mold
Spring Valley 9 working days

Mold Remediation and Full Rebuild

A slow supply-line leak under a bathroom vanity fed the wall cavity for weeks. We remediated the affected assembly and rebuilt the room — containment, removal, new drywall, texture, paint and trim.

See the full project
Water Damage Rebuild After a Supply Line Failure — before and after in Centennial Hills — after
Water Damage Rebuild After a Supply Line Failure — before and after in Centennial Hills — before
BeforeAfterDrag to compare
Water & Mold
Centennial Hills 8 working days

Water Damage Rebuild After a Supply Line Failure

A refrigerator supply line failed overnight and flooded the kitchen and hallway. We handled the removal, subfloor correction, flooring, drywall and trim — the full put-back under one company.

See the full project
Ceiling Drywall Repair and Texture Match — before and after in Summerlin South — after
Ceiling Drywall Repair and Texture Match — before and after in Summerlin South — before
BeforeAfterDrag to compare
Drywall & Paint
Summerlin South 3 working days

Ceiling Drywall Repair and Texture Match

An AC condensate line had been draining into a ceiling for months. We traced the source, replaced the damaged ceiling board and matched the knockdown texture so the repair disappeared.

See the full project
Bathroom Shower Tile and Valve Replacement — before and after in Peccole Ranch — after
Bathroom Shower Tile and Valve Replacement — before and after in Peccole Ranch — before
BeforeAfterDrag to compare
Kitchens & Baths
Peccole Ranch 5 working days

Bathroom Shower Tile and Valve Replacement

A failed shower valve was feeding the wall behind the tile. We opened the wall, replaced the valve, rebuilt the substrate with proper waterproofing and re-tiled the surround.

See the full project
Full-Unit Flooring Replacement — before and after in Henderson — after
Full-Unit Flooring Replacement — before and after in Henderson — before
BeforeAfterDrag to compare
Flooring & Trim
Henderson 4 working days

Full-Unit Flooring Replacement

Fifteen-year-old carpet came out of a 3-bedroom rental and new luxury vinyl plank went down throughout, over a corrected and leveled subfloor, with new baseboards.

See the full project
Exterior Fascia Repair and Garage Door Painting — before and after in Lone Mountain — after
Exterior Fascia Repair and Garage Door Painting — before and after in Lone Mountain — before
BeforeAfterDrag to compare
Drywall & Paint
Lone Mountain 3 working days

Exterior Fascia Repair and Garage Door Painting

Sun-damaged fascia boards were repaired and sealed, and the garage door and exterior trim were repainted — the curb-appeal work that decides how the listing photo reads.

See the full project
Kitchen Cabinet and Countertop Installation — before and after in Southern Hills — after
Kitchen Cabinet and Countertop Installation — before and after in Southern Hills — before
BeforeAfterDrag to compare
Kitchens & Baths
Southern Hills 3 weeks

Kitchen Cabinet and Countertop Installation

An outdated kitchen was rebuilt with new shaker cabinets, quartz countertops, a tile backsplash and new flooring — sequenced under one company from demolition to the final punch walk.

See the full project
Interior Door and Trim Replacement — before and after in Summerlin South — after
Interior Door and Trim Replacement — before and after in Summerlin South — before
BeforeAfterDrag to compare
Turnovers
Summerlin South 3 working days

Interior Door and Trim Replacement

A bedroom reset: drywall patched and texture-matched, walls repainted, and hollow-core doors and trim replaced with new casing and baseboards.

See the full project

Projects shown from Las Vegas, Henderson, Summerlin, North Las Vegas, Spring Valley, Centennial Hills, Peccole Ranch, Lone Mountain and Southern Hills.

Want your property in this library?

Send us the address and the deadline. You will get a written, line-item scope — and a finished property that photographs like the ones above.

NV State Licensed · Fully Insured · CMRC Certified Mold Remediation